Contract 56065 REL 6: 2007-246-00 EXP PNNL RESTORATION OF BULL TROUT PASS
Project Number:
Title:
Restoration of Bull Trout Passage at Albeni Falls Dam
Stage:
Implementation
Area:
Province Subbasin %
Intermountain Pend Oreille 100.00%
Contract Number:
56065 REL 6
Contract Title:
2007-246-00 EXP PNNL RESTORATION OF BULL TROUT PASS
Contract Continuation:
Previous: Next:
56065 REL 1: 2007-246-00 EXP PNNL RESTORATION OF BULL TROUT PASS
  • 56065 REL 10: 2007-246-00 EXP PNNL RESTORATION OF BULL TROUT PASS
Contract Status:
Closed
Contract Description:
The goal of this project is to provide temporary upstream passage for bull trout at Albeni Falls Dam, Pend Oreille River.  We propose to collect bull trout below the dam using boat electrofishing. The fish will then be transported above Albeni Falls Dam and released near Priest River, Idaho, or re-released below the dam depending on water temperature and number of fish captured.  Prior to release each fish will be implanted with a combination radio-acoustic transmitter to track the fish to potential spawning tributaries of Pend Oreille Lake. A system of stationary radio receiving stations and airplane/truck/boat surveys will be used to monitor the movement of the tagged fish. This project provides direct on-the-ground benefits for endangered bull trout in the Pend Oreille Basin because it will allow fish, whose migration corridor has been blocked by a dam without fish passage, to return to their natal streams and contribute their genes (which would otherwise have been lost) to the spawning population.
Account Type(s):
Expense
Contract Start Date:
04/05/2013
Contract End Date:
04/30/2014
Current Contract Value:
$89,790
Expenditures:
$89,790

* Expenditures data includes accruals and are based on data through 30-Nov-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
Brian Bellgraph Pacific Northwest National Laboratory Yes Supervisor brian.bellgraph@pnnl.gov (509) 371-7185
Julie Hughes Pacific Northwest National Laboratory No Contract Manager julie.hughes@pnl.gov (509) 371-7202
Paul Krueger Bonneville Power Administration Yes F&W Approver pqkrueger@bpa.gov (503) 230-5723
Joe Maroney Kalispel Tribe Yes Technical Contact jmaroney@knrd.org (509) 447-7272
Ryan McNee Kalispel Tribe Yes Technical Contact rmcnee@kalispeltribe.com (509) 447-7423
Khanida Mote Bonneville Power Administration Yes Contracting Officer kpmote@bpa.gov (503) 230-4599
Jenna Peterson Bonneville Power Administration Yes Interested Party jepeterson@bpa.gov (503) 230-3018
Jennifer Snyder Bonneville Power Administration Yes Env. Compliance Lead jasnyder@bpa.gov (503) 230-4187
Janie Vickerman Pacific Northwest National Laboratory Yes Administrative Contact janie.vickerman@pnnl.gov (509) 371-7260
Virgil Watts III Bonneville Power Administration Yes COR vlwatts@bpa.gov (503) 230-4625


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
Ensure environmental compliance requirements are complete A: 165. Complete environmental compliance requirements 04/30/2014 03/31/2014
Testing and calibration of all monitoring stations B: 70. Test all stations prior to FY13/14 monitoring season, if applicable 06/14/2013 04/09/2013
Functioning radio monitoring stations C: 157. Maintain and download radio receiving stations 04/30/2014 04/30/2014
Develop a profile of each fish tracked D: 162. Data reduction and analysis 01/15/2014 01/15/2014
Attach Progress Report in Pisces E: 132. Submit Progress Report for the period 16 November 2012 to 15 November 2013 03/31/2014 03/31/2014
Fulfill all administrative tasks with quality products and in a timely manner. F: 119. Manage Project 04/30/2014 04/30/2014
Testing and calibration of all monitoring stations G: 70. Test all stations prior to FY14/15 monitoring season, if applicable 04/30/2014 03/31/2014
Equipment removed and stored I: 70. Remove telemetry stations 11/30/2013 10/30/2013

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Trout, Bull (S. confluentus) (Threatened)
  • 3 instances of WE 70 Install Fish Monitoring Equipment
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data
  • 1 instance of WE 162 Analyze/Interpret Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Complete environmental compliance requirements 04/05/2013
B 70 Test all stations prior to FY13/14 monitoring season, if applicable 04/05/2013
C 157 Maintain and download radio receiving stations 04/05/2013
D 162 Data reduction and analysis 04/05/2013
E 132 Submit Progress Report for the period 16 November 2012 to 15 November 2013 04/05/2013
F 119 Manage Project 04/05/2013
G 70 Test all stations prior to FY14/15 monitoring season, if applicable 04/05/2013
H 185 Periodic Status Reports for BPA 04/05/2013
I 70 Remove telemetry stations 04/05/2013